Glue Spraying Process Requirements

Nov 15, 2023

Leave a message

The spraying sequence is end face → front linear → front+linear → end face, and the flat part can be sprayed once; Two coats of spray are required at the end face and flat line.
The activity time after mixing the main agent and curing agent is 4-6 hours. The sprayed workpiece should be processed within 4 hours to achieve the best bonding effect. Otherwise, due to the cross-linking reaction of the adhesive, the activation temperature needs to be increased. Although the bonding effect is good from the appearance, the temperature resistance has significantly decreased. If the adhesive is sprayed again, adhesive marks will appear on the surface of PVC.
After spraying, the surface turns white and dry, and does not stick to the hands or has a noticeable adhesive film gloss after drying. The drying time is 30-50 minutes (depending on the temperature, humidity, and spraying quality of the environment).
The commonly used fan is aligned 1.5-2.0 meters away from the workpiece to blow away humid air, in order to avoid PVC bubbles caused by high humidity in the workpiece.
In winter, in order to increase the temperature of the workpiece, a small insulation room can be used to heat the workpiece to 20-25 ℃ (temperature exceeding 35 ℃ is prohibited, otherwise the workpiece will deform). Glue spraying should be carried out on a water curtain machine in an environment not lower than 16 ℃.
Glue spraying operators should wear masks to protect their physical health.